Customization: | Available |
---|---|
Production Scores: | Multiple Varieties |
Condition: | New |
Still deciding? Get samples of US$ 1000/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Realization of main and branch pipe grouping (main pipe: flange + straight pipe + sealing bubble, branch pipe: flange + straight pipe)
1.After the main pipe passes through the predetermined position and is clamped by the chuck, the branch pipe is welded with the flange first, and the cross-center positioning device positions the branch pipe flange. The main pipe is supported by the shear bracket and adjusted to the corresponding height, so that the saddle mouth of the main pipe is positioned with the saddle positioning device.
2.Group the main pipe and branch pipe. Loosen the spindle, rotate 90 degrees, assemble the saddle mouth, position the cross-center positioning device, lock the spindle and spot weld.
1.What is your nature of your company:dealer or factory ?
We are manufacturer with a big factory ,warmly welcome to visit our factory and contact us.
2. Which export port you use?
Any China ports. Commonly, we will use Dalian port. But it can be appointed as you like.
3.How about the warranty?
Warranty period of one year (since the completion of mechanical debugging at the buyer's factory). During the warranty period, if there is a problem with the equipment, we are responsible for repairing and replacing parts free of charge, but we do not provide coverage for perishable parts, lost parts, consumable parts, or human damaged parts.
4.What shall we do if don't know how to operate your machine?
We have detail installing and operating instructions attached, also comes with video.Our after sale service hot line will be available for 24H everyday.
5.What if we have any problem with the machine?
We will get back to you with solutions with maxmum of 24 hours after receiving your description of what the problem is.